How to Read a Metering Junction Box Wiring Diagram
CT Secondary Wiring Explained

The metering junction box is the hub of the energy metering circuit— how do the CT secondary conductors run, how is the voltage circuit connected, and how is a test terminal block used? This article follows GB/T 17215(electrical measuring equipment) to illustrate metering junction box field wiring, with three-phase three-wire and three-phase four-wire metering wiring comparisons. Zhejiang Golden Unicorn produces 5,000+ meter boxes and metering cabinets per year.

1. What Is a Metering Junction Box? (Test Terminal Block)

A metering junction box is also called atest terminal blockortest switch, installed between the CT secondary circuit and the kWh meter. Its functions: (1) short the CT secondary side when testing or replacing the meter with the circuit energized (the CT secondary must never be open-circuited); (2) carry the CT secondary current to the kWh meter.

SCHEMATICBusbarsTerminal blocksMain circuit breakerControl & protection devicesTerminal block outgoing cables
Figure — 1. What Is a Metering Junction BoxCabinet structure diagram · photo pending

2. Three-Phase Three-Wire Metering Wiring (2 CTs · 2 Elements)

Three-phase three-wire systems use 2 current transformers(V/V connection), with 2 secondary winding sets connected through the test terminal block to the kWh meter:

TerminalConnect
CT1 secondary K1test block terminal 1 → meter I1
CT1 secondary K2test block terminal 3 → meter I2
CT2 secondary K1test block terminal 5 → meter I3
CT2 secondary K2test block terminal 7 → meter I4

3. Three-Phase Four-Wire Metering Wiring (3 CTs · 3 Elements)

Three-phase four-wire systems use 3 current transformers(Y/y connection), 3 sets of secondary windings wired to the meter through a test terminal block:

TerminalConnect
TA1 secondarytest block 1-2 → meter I1
TA2 secondarytest block 3-4 → meter I2
TA3 secondarytest block 5-6 → meter I3
TA commontest block 7 → meter I4 (N terminal)
SCHEMATICBusbarsTerminal blocksMain circuit breakerControl & protection devicesTerminal block outgoing cables
Figure 3 — Three-phase four-wire metering wiringCabinet structure diagram · photo pending

4. Test terminal block internal structure (shorting link)

Key point

Inside the test terminal block there is ashorting link (connecting bar): in normal operation the link is open (the CT secondary current passes through to the meter); during testing,close the link, shorting the CT secondary, so the meter can be removed safely.The CT secondary must never be left open— an open circuit produces high voltage that breaks down insulation.

5. Common metering wiring errors (3 red lines)

  1. Open CT secondary→ high voltage → insulation breakdown → safety hazard; always short the secondary before removing the meter.
  2. Reversed polarity→ K1/K2 reversed → meter runs backward → metering error.
  3. Voltage circuit miswired→ voltage phase sequence does not match current phase sequence → metering deviation.

FAQ FAQ

What is the purpose of a metering terminal block?

It provides ashortable connection pointbetween the current transformers and the meter, so the meter can be tested or replaced without shutting off power; the CT secondary must never be left open.

Why must the CT secondary never be left open?

With an open circuit the secondary current is zero, the core saturates, and ahigh voltage (up to several thousand volts)is produced, breaking down insulation and endangering personnel.

What is the difference between three-phase three-wire and three-phase four-wire metering?

Three-phase three-wire uses 2 CTs (V/v connection); three-phase four-wire uses 3 CTs (Y/y connection). The terminal block has a different number of terminals.

How do you operate the links when testing a meter?

First close the links to short the CT secondary → remove the meter → after reinstalling, open the links to restore normal metering.

Related pages:Technical notes · Products · Industries · Resource center · FAQ · Get a quote

Related reading

Need Distribution box, distribution cabinet? Build to drawing · MOQ 1 unit · 15–25 day delivery

A source factory in Zhejiang (Fengchuan Industrial Zone, Tonglu — 5,000 sqm, a team of 20, 5,800+ units a year), holding ISO 9001:2015 / CE(LVD+EMC) / IP65 test report. Build-to-drawing service for distribution boxes, low-voltage assemblies, PLC control cabinets and VFD panels. Free drawing review, photo/video inspection before shipment.