How to Wire a Junction Box
Crimp vs. Twist vs. Solder — 3 Methods Compared

How do you make compliant splices inside a junction box?— Crimp, twist and solder each suit different situations. This article works through the operating points and acceptance criteria for all three methods per GB/T 9330(plastic-insulated control cable), with a crimping tool selection table. Zhejiang Golden Unicorn ships 100% crimped100% crimped + bolted terminations,ISO 9001:2015 certified.

1. The Three Termination Methods Compared (Crimp / Twist / Solder)

MethodPrincipleReliabilityApplicationCode
CrimpWire cap / cold-pressed terminal, mechanically compressed★★★★★All permanent terminationsGB/T 9330
TwistHand twist + insulating tape★★★Temporary / repairNot recommended for permanent
WeldingSolder★★★★Signal / low-voltageRequires auxiliary support
SCHEMATICBusbarsTerminal blocksMain circuit breakerControl & protection devicesTerminal block outgoing cables
Figure — 1. The Three Termination Methods ComparedCabinet structure diagram · photo pending

2. Crimp Terminations in Detail (Recommended Practice)

Crimping is theonly permanent connection method recommended by GB 50303. Key operating points:

  1. Stripping: remove 8–12mm of insulation without nicking the conductor.
  2. Crimp-on ferrule: select the ferrule that matches the conductor cross-section (e.g., OT2.5 for 2.5 mm²).
  3. Crimping: use a dedicated crimping tool and make two crimps. The joint must not pull apart after crimping.
  4. Insulation: cover with heat-shrink tubing or an insulating cap. Exposed conductor ≤ 1 mm.

3. Twist splicing: when is it allowed? (Temporary / repair)

⚠️ Limitations

Twist splicing is only permittedtemporary repair or emergencyuse. It must not be used for permanent installation. Twist splicing requirements: (1) cross the two conductors at 90° and twist ≥ 6 turns; (2) bend back the ends ≥ 2 turns; (3) after twisting, wrap with insulating tape first, then with waterproof tape.Twist splices will not pass formal project acceptance..

4. Soldering: low-voltage signal circuits only (signal / instrumentation)

Soldering is used forsignal lines, instrument lines and other low-voltage signal circuits. Soldering key points: (1) the solder joint must be bright with no cold solder; (2) heat-shrink tubing must be applied after soldering for insulation; (3) large-cross-section power conductors must not be soldered (solder has high resistance and will overheat under high current).

SCHEMATICBusbarsTerminal blocksMain circuit breakerControl & protection devicesTerminal block outgoing cables
Figure — 4. Soldering: low-voltage signal circuits onlyCabinet structure diagram · photo pending

5. Crimping tool selection (by cross-section)

Conductor cross-sectionCrimp-on ferruleCrimping toolCrimping die
0.5–1.5mm²OT0.5–1.5Manual0.5–1.5
1.5–2.5mm²OT1.5–2.5Manual1.5–2.5
4–6mm²OT4–6Hydraulic4–6
10–16mm²OT10–16Hydraulic10–16

FAQ FAQ

Must junction box wiring always be crimped?

GB 50303 recommends crimping. Twist splicing is only for temporary repair; formal project acceptance requires crimped or bolted connections.

What is the pull-out force after crimping?

For 2.5 mm² copper wire, the pull-out force after crimping is ≥ 80 N. Passing means it does not pull apart.

How do you connect copper and aluminum conductors?

You must usea copper-to-aluminum transition terminal. Direct copper-to-aluminum contact causes electrochemical corrosion, and the increased contact resistance leads to overheating.

Can solder be used on power conductors?

No. Power conductors carry high current; solder has high resistance and will melt from heat, causing poor contact or even fire.

Related pages:Technical notes · Products · Industries · Resource center · FAQ · Get a quote

Related reading

Need Distribution box, distribution cabinet? Build to drawing · MOQ 1 unit · 15–25 day delivery

A source factory in Zhejiang (Fengchuan Industrial Zone, Tonglu — 5,000 sqm, a team of 20, 5,800+ units a year), holding ISO 9001:2015 / CE(LVD+EMC) / IP65 test report. Build-to-drawing service for distribution boxes, low-voltage assemblies, PLC control cabinets and VFD panels. Free drawing review, photo/video inspection before shipment.