08 Industry solutions Nine industries · 01 Water & Environmental 2026-09-10 Published

Control cabinets built for wet areas, pump houses and outdoor sites

Pump stations and water plants are the hardest place for a cabinet: permanently damp, chlorinated air, nobody on site at night, and no shutdowns all year. Filter presses are a different kind of hard — hundreds of cycles a day, with the cabinet shaking along. GU ELECTRIC builds the enclosure, the drive section and the process program for that reality, and runs a powered functional test on every unit before dispatch.

IP65
Outdoor sealed enclosure
304 / 316
Stainless steel for wet and dosing areas
98%
on-time delivery
Control Cabinet (custom build, workshop photo · illustrative)
Control Cabinet (custom build, workshop photo · illustrative)Workshop photo · illustrative
Photo notesAll images on this page are workshop photos of custom-built cabinets (illustrative, not tied to a specific project). To see site photos from similar operating conditions, we can arrange a video walkthrough of cabinets in production on our shop floor.

Why ordinary cabinets do not survive in a water plant

A cabinet that holds up in a dry workshop will not necessarily survive a chlorinated, condensing, unmanned pump house. These are the four failure modes we design against — we have repaired too many counter-examples.

Failure mode 01

Condensation and corrosion, rotting from the inside out

Wet areas cycle hot and cold every night. If the bottom gland plate is not sealed, there is no anti-condensation heater, and the coating is the wrong grade, moisture gets in and eats the terminals — usually within 18 months, and always in the worst season of the year.

Failure mode 02

VFD overheating and nuisance trips

Pump VFDs run 24 hours a day, sealed inside a cabinet. Without enough heat dissipation, without an input reactor, and with power and analog cables sharing a duct, you get tripping that looks like a VFD fault but is actually a thermal and EMC problem.

Failure mode 03

An alarm at 3 a.m. and nobody on site

An unmanned station needs a cabinet that can speak. Without a clean I/O mapping, spare capacity and a defined communication interface, connecting SCADA later means rewiring a cabinet you have already paid for.

Failure mode 04

A late cabinet holds up the whole commissioning

On municipal and EPC projects the control cabinet is often specified last and blamed first. Missing documentation and inconsistent wire numbering can make site rework cost more than the cabinet itself.

What changed inside the cabinet, and why it works

Four design decisions, each mapped to a failure mode above. Every one is a standard option we can quote directly, not a special request.

Design decisionWhat changes in the cabinetHow to verify
Moisture ingress and corrosionIP65 foamed door gasket, sealed bottom gland plate, touchscreen window with 1-2 mm fit and a sealing groove, anti-condensation heater with humidity controller; 304 / 316 stainless steel when the environment calls for it.IP test report to IEC 60529 / GB 4208 supplied with the cabinet.
VFD overheating and interferenceHeat load calculated from motor data, then filtered fans, heat exchangers or cabinet air conditioners; ≥150 mm air path above and below the VFD, input reactors, and analog signals routed separately from power.Temperature-rise type verification on a design prototype (busbar ≤70 K).
Unmanned operation20% spare I/O, a defined Modbus RTU/TCP or Profinet interface, and every field terminal numbered — the platform integrator can connect without visiting site.As-built schematic and terminal schedule delivered with the cabinet.
Commissioning deadline riskDelivered 15-25 days after drawing approval, 98% on-time; the documentation pack — schematic, BOM, test report, packing list — reaches you before the cabinet does.Finished-cabinet photos and routine test records before dispatch.

Equipment and applications we have built in this category

Water and environmental is one of our main focuses. Both items below have their own design documentation and photography — we can talk about the approach directly.

Water treatment (pump stations / dosing / aeration)
Intake and booster pump stations, aeration and return sludge in wastewater plants, dosing and metering systems. Includes duty/standby rotation, constant-pressure VFD control, and level and flow interlocks.
● Photos available
Filter press control cabinet
Full feed, squeeze, blow-down and discharge sequence for plate-and-frame and membrane filter presses, including pressure hold and plate-shift trolley control.
● Photos available

Application packages for water & environmental

These are the equipment and approaches we have built in this category. Each package page covers the duty conditions, the problem, how the cabinet is configured, and what can be customized per project.

Three cabinet types cover a whole water plant

Most water projects are a combination of these three. If your scope differs, we build to your single-line diagram.

Control Cabinet (custom build, workshop photo · illustrative)
Control Cabinet (custom build, workshop photo · illustrative)Workshop photo · illustrative

Outdoor stainless steel PLC control cabinet

The brain of the pump station: level and flow logic, pump rotation, alarm handling, and a communication interface up to SCADA.
  • EnclosureIP65, single or double door, 304 stainless steel or powder-coated steel
  • Control systemSiemens / Mitsubishi / Delta PLC, 4-15 inch touchscreen
  • AccessoriesAnti-condensation heater, door-operated light, surge protection
  • StandardsIEC 61439-1/-2 · CE (LVD + EMC)
Control Cabinet (custom build, workshop photo · illustrative)
Control Cabinet (custom build, workshop photo · illustrative)Workshop photo · illustrative

VFD panel with drive section and cooling

Duty/standby or multi-pump VFD control, with optional bypass — the key point being that the VFDs must actually stay cool.
  • VFDSiemens SINAMICS, ABB ACS, Schneider Altivar, Delta CP2000
  • OptionsBypass contactors, input reactors, harmonic filters, soft starters
  • CoolingFiltered fans, heat exchangers or cabinet air conditioners sized to the heat load
  • ProtectionMCCBs, motor protection switches, phase-loss and dry-run protection
Control Cabinet (custom build, workshop photo · illustrative)
Control Cabinet (custom build, workshop photo · illustrative)Workshop photo · illustrative

Outdoor distribution & junction boxes

On-site power distribution, lighting, dosing equipment and instrument supply — sealed, lockable, with the number of circuits matched to your needs.
  • FormatWall-mounted or floor-standing, 4-36 circuits
  • ProtectionMCB / MCCB / RCD / RCBO, class 2 surge protection
  • ConstructionRain canopy, foamed door gasket, stainless steel external hardware
  • MarkingLaser-engraved labels and asset numbering

Photo evidence: complete unit, interior and industry-specific details

The three slots below are photo positions for cabinets in this industry. We have built for these duty conditions, but site photos have to be collected project by project; placeholders are used until then, with a brief under each. Replace once photos arrive — no customer or project is identified on the page.

Filter press control cabinet · Photo 02
Filter press control cabinet · Photo 02Workshop photo · illustrative
Filter press control cabinet · Photo 06
Filter press control cabinet · Photo 06Workshop photo · illustrative
VFD Installation and Ventilation Clearance Inside the Cabinet
VFD Installation and Ventilation Clearance Inside the CabinetWorkshop photo · illustrative

From drawing to shipment, in five steps

IP65 sealed enclosure with bottom gland plate, timed duty/standby rotation with hour equalization, bypass on the VFD or soft-starter drive section, 20% spare I/O, and full Modbus interface documentation; filter press cabinets additionally include pressure-hold and plate-shift programs.

01 Send drawings & duty conditions

Send the single-line diagram / load list / protection requirements / quantity. Quote within 1 working day.

02 Drawing review

An electrical engineer verifies the selection item by item, with a call if circuit details need clarifying, and issues a revised schematic.

03 Order & scheduling

Delivered 15-25 days after scheduling begins; urgent orders can take a fast track (volume plus stock components).

04 Factory testing

Every unit gets a powered functional test + 2500 V·1 min withstand + ground continuity + IP sampling.

05 Dispatch & acceptance

Finished-cabinet photos and routine test records before dispatch; the full documentation pack travels with the cabinet so commissioning can start on arrival.

Water & environmental control cabinets

IP65 outdoor control cabinets, VFD water supply panels and PLC control cabinets with SCADA interfaces, custom-built for pump stations, wastewater plants, dosing rooms and filter presses. Optional 304/316 stainless steel, compliant with IEC 61439 and CE, delivered in 15-25 days.

Factory documentation packSchematic · BOM · routine test report · packing list · certificate of conformity
Keys / handles2 per unit (as agreed in contract)
Door-operated lightLED 220V, comes on automatically when the door opens
DesiccantSilica gel sachets fixed inside the cabinet
As-built drawing + terminal scheduleElectronic and paper copies with the cabinet
Optional: spare parts kitCommon relays / indicators / encoders, quoted as required

Industry FAQs

Can an outdoor pump station cabinet really be IP65?

Yes. IP65 is a method, not a promise: foamed door gasket, sealed bottom gland plate, sealed touchscreen window, rain canopy. The IP test report is supplied with the cabinet. For coastal sites or dosing rooms we recommend 316 stainless steel outright rather than powder-coated steel.

Do we supply the VFDs, or do you buy them?

Either way. We usually source Siemens SINAMICS, ABB ACS, Schneider Altivar and Delta, and we also build cabinets with VFDs you send to our factory. If a particular rating has a long lead time, we tell you at quotation stage so you can decide.

Can the cabinet connect to our existing SCADA?

In most cases, yes. We wire to documented Modbus RTU/TCP, Profinet or EtherNet/IP interfaces and leave 20% spare I/O as standard. Send us the protocol and register map you use and we will confirm compatibility before quoting.

Do you write the filter press program?

Yes. The feed-squeeze-blow-down-discharge sequence, pressure-hold time, plate-shift trolley position and pressure interlocks are all written into the PLC and simulation-tested before dispatch. If you have an existing process sequence, we can implement that instead.

How do you handle damp or chlorinated environments?

Material first — 304 for general wet areas, 316 for dosing rooms and coastal sites. Then sealing: an anti-condensation heater with humidity controller, and a coating held at 60-80 μm film thickness after phosphating. Tell us the medium on site and we will specify honestly.

MOQ and lead time?

MOQ 1 unit, 5 or more recommended for production; 15-25 days after drawing approval, with 98% on-time delivery. Spare-parts cabinets and repeat orders are usually faster because the drawings already exist.

The other eight categories

Tell us about your pump station or filter press

Building or upgrading a pump station, wastewater plant or filter press line?

Free engineering review · indicative pricing the same day · drawings, photos and sketches all accepted

Write to us →WhatsApp: +86 186 5712 0011More contact options