GU ELECTRIC — Beyond the CabinetGU ELECTRIC — Beyond the Cabinet
Home › Factory & Processes › Structural Design
Structural design: concept drawing → general arrangement drawing → cutout/installation drawings. Nothing reaches the shop floor until review is passed.

Design: From Function to Drawings — Manufacturability Cleared First

Factory & Process · Process Page · 2026-09-10

Structural Design: From Requirements to Drawings

A cabinet's structure locks in its problems at the design stage. Our design engineers first produce a concept drawing (draft) based on the functional requirements you provide, then develop the general arrangement drawing, cutout drawings and installation drawings — all three must pass review before the job goes to the shop floor.

Photos are taken on site and carry our own brand watermark (present in the original image), for on-site verification during factory audits. The design workstation's wire marking machine, drawing printer and other support equipment are all in the same area.

What the design process delivers

What does this process mean for your project? Ask an engineer

Send your operating conditions (component types, batch size, special requirements) to an engineer, and we'll explain exactly how this process is carried out on your project.

Ask about process details
GU Electric (Zhejiang Golden Unicorn Electrical Technology) · No. 27 Huigang Road, Fengchuan Industrial Zone, Tonglu · 5,000 sqm workshop
sales@gu-electric.com · WhatsApp: +86 186 5712 0011 · ISO 9001:2015 · CE (LVD+EMC) · IP65 test report