Component Mounting: Six-Step Standard Work, 30–40 N·m Torque, Anti-Loosening on Critical Components
Component Mounting: Six-Step Process, 30–40 N·m Torque
Component Mounting: Six-Step Standard Process
In-cabinet component mounting follows six steps, with sequence and torque per the work instruction:





Photo carries our own brand watermark (present in the original image); compare it on site during a factory audit.
Six-Step Process
①
Work from Drawings
Cross-Check Against BOM and Secondary Schematics
Cross-Check Against BOM and Secondary Schematics
②
DIN Rail / Mounting Plate Positioning
Level and Elevation
Level and Elevation
③
Seat Components
Per Drawing Tag Numbers
Per Drawing Tag Numbers
④
Initial Tightening
Leave Adjustment Allowance
Leave Adjustment Allowance
⑤
Alignment / Centering
Indicator Lights and Pushbuttons
Indicator Lights and Pushbuttons
⑥
Final Tightening + Marking
Anti-Loosening Line
Anti-Loosening Line
Torque and Anti-Loosening
- Torque within the 30–40 N·m range (adjusted per component specification);
- Anti-loosening lines / marks on critical components;
- Re-verify tag numbers before wiring to prevent misconnection.
What does this process mean for your project? Ask an engineer
Send your operating conditions (component types, batch size, special requirements) to an engineer, and we'll explain exactly how this process is carried out on your project.
Ask about process detailsGU Electric (Zhejiang Golden Unicorn Electrical Technology) · No. 27 Huigang Road, Fengchuan Industrial Zone, Tonglu · 5,000 sqm workshop
sales@gu-electric.com · WhatsApp: +86 186 5712 0011 · ISO 9001:2015 · CE (LVD+EMC) · IP65 test report
sales@gu-electric.com · WhatsApp: +86 186 5712 0011 · ISO 9001:2015 · CE (LVD+EMC) · IP65 test report